Initial tenant interior build-out of partial 39th floor office space…
Initial tenant interior build-out of partial 39th floor office space to include coms/idf room; work room; computer lab, and pre-action room. Work to…

High-intent commercial framing jobs in Chicago, IL, scored by how soon the GC needs a framing sub. See the job, the stage and who to call, while the job is still open.
A sample of the 616 open jobs, sorted by who to call first. Your free account unlocks the address, the general contractor and the owner on every one.
Initial tenant interior build-out of partial 39th floor office space to include coms/idf room; work room; computer lab, and pre-action room. Work to…
Direct developer services; 2019 cbc. New construction. Caissons, shallow foundations, underground utilities, level 1 steel framing and decking, maso…
Mechanical equipment upgrades (kitchen), with associated structural & electrical work. Structural repairs to areas of roof deck. (occupancies: b, r-…
Full building job for 2 story frame, 2 dwelling unit residence with basement and new 2 car parking pad. Electrical, mechanical, and plumbing per pla…
Full building job for 2 story frame, 2 dwelling unit residence with basement and new 2 car parking pad. Electrical, mechanical, and plumbing per pla…
Full job for new 3-story, 3 dwelling units frame building with rear porch and 3-car concrete parking pad (occupancy r5, construction type v-a)
| ZIP | Open framing jobs | Call today | Median job |
|---|---|---|---|
| 60601 | 45 | 1 | $40K |
| 60612 | 32 | 0 | $475K |
| 60611 | 27 | 1 | $45K |
| 60637 | 26 | 5 | $450K |
| 60605 | 23 | 0 | $5K |
| 60624 | 21 | 2 | $380K |
| 60618 | 17 | 0 | $721K |
| 60606 | 16 | 1 | $697K |
Buildedly tracks new construction and remodeling activity across Chicago and Cook County every day and picks out the jobs that need framing work: new homes, additions and structural work that need a framing crew. Right now that is 616 open jobs, with an estimated $118M to $235M of framing work in play.
The median job is about $200K, and 348 jobs are $100K or more. The busiest ZIP is 60601, with 45 open framing jobs.
Framing is an early trade. GCs line up framing contractors while the job is still in planning or just approved, so the best window is the first 10 days after a project moves. All 616 are approved and moving.
Call as soon as plans are approved. Framing is the first big sub on most jobs and is often booked before ground breaks. Every lead shows the general contractor or owner to call, so you are pitching a real job instead of buying a shared form fill.

There are 616 open commercial framing jobs in Chicago, IL as of October 28, 2026. 18 are flagged to call today and 126 were added in the last 30 days.
No. These aren't form fills sold to several contractors. Each lead is a real project in Chicago, IL with the job size, stage and the general contractor or owner to call, so you are pitching a job that is actually moving.
Nothing right now. Buildedly is free during early access, with full access to every job, contractor and owner contact. No card is needed to sign up.
67% of these jobs name a general contractor and 82% have an owner name and mailing address. Your free account shows the address, the GC and the owner on every job.
Framing is an early trade. GCs line up framing contractors while the job is still in planning or just approved, so the best window is the first 10 days after a project moves.
Every framing job in Chicago, IL, with who to call. No card needed.